Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/www/users/bolanknkga/wp-includes/functions.php on line 6121 Du Toit Renovations, Op-die-Berg - Boland Bouers

Du Toit Renovations, Op-die-Berg

The job involves repairing and renovating 3 houses.
Currently working on house 1 and house 3 simultaneously.

House 1: will be a 4 bedroom house once finished.
Alterations to the existing house include creating an open plan kitchen/living room, upgrading of the bathroom & toilet, and replacing all the old ceilings throughout the house.
Additions include a master bedroom with en suite bathroom and dressing room. Also the addition of a braai room and garage.

House 3: is an older 4 bedroom house.
Alterations include creating an open plan living/braai room, repair work on wooden flooring and wooden beams and ceilings.
Additions include a new kitchen, pantry, wash room, en suite bathroom and a double garage.

House 1

House 3